01

Kitchen remodel
Layout, cabinetry, countertops, backsplash, lighting, plumbing, and electrical, managed as one kitchen.

Tile
Floor tile, wall tile, showers, and backsplash, set with the rooms they meet.
Let's buildGet an estimateTILE
Tile is installed as part of the room, not as a finish dropped in at the end. Floors, walls, showers, and backsplashes are laid out with the grout, the pattern, and the surfaces around them. In a wet room, waterproofing comes before the tile.

01
Tile floors laid out for the room and the doorways they meet, including the grout joint and the transition to the next surface.
02
Walls set plumb, with the pattern held from the first course so the field does not drift as it climbs.
03
Shower walls, floors, niches, and benches. Waterproofing is in place before the tile goes on.
04
Kitchen and bath backsplashes chosen with the counter and the light, then installed to the outlets, the hood, and the window.
05
Straight set, herringbone, or a quieter field. The layout is drawn before the first tile is cut.
06
On its own, or with a kitchen, a bathroom, new flooring, or a whole-home renovation. The same team owns the edges where materials meet.
Yes, in showers and other wet areas. The tile is only as sound as what is behind it, so waterproofing is part of the installation.
Service area